Automic intelligent magnetoelectric water meter is a kind of integrated and detachable smart water meter based on magnetoelectric technology. It has the advantages of small pressure loss, large flow, high precision and long service life. The counter is vacuum-sealed, and the reading remains clear forever. The detachable structure makes the water meter unnecessary to be removed from the pipeline for movement repair or replacement, which is convenient for maintenance and repair.
Anti-blocking
Magnetoelectric metering is used and is accurate. The impeller is prevented from clogging. It has a longer service life than the traditional reed switch pulse water meter;
Wide range
Range: 1.5 m3/h~100 m3/h;
Small Error
The maximum allowable error in the low zone from including the minimum flow to excluding the boundary flow is ±4%; the maximum allowable error in the high zone from including the boundary flow to including the overload flow rate is ±2%;
Integration
Integrated GPRS remote communication module can realize remote communication without purchasing remote communication equipment;
Low power consumption
The built-in high-energy battery can guarantee no less than 6 years of continuous measurement.
Environmental protection and corrosion resistance
The meter body is mainly made of long-wave fiber composite materials. It is environment-friendly and 100% recyclable; resists corrosion, low temperature (- 60°C) and ultraviolet ray. It features fast production speed and low processing cost.
Product qualifications
Computer Software Copyright Registration Certificate Issued by the National Copyright Administration of the People's Republic of China, Pattern Approval Certificate of the Measuring Instruments of the People's Republic of China, CMC (China Metrology Certification), Certificate for Advanced Practical Water Resources Technology Promotion, Design Patent Certificate, Utility Model Patent Certificate
Application cases
Water Resources Monitoring Capacity Building Pipeline-based Water Withdrawal User Monitoring Equipment Purchase and Installation Project of Shanxi Province; Nanchang City Mantingchun MOMA Project Phase II Energy Computer Room Water Withdrawal Point Remote Monitoring Project of Jiangxi Province; National Water Resources Monitoring Capacity Water Intake Measurement Integration Project of Guangxi Province